skip navigation


  • Title 33 -- Navigation and Navigable Waters
    • CHAPTER II -- CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE

Part

  • 203 Emergency employment of Army and other resources, natural disaster procedures
  • 207 Navigation regulations
  • 208 Flood control regulations
  • 209 Administrative procedure
  • 210 Procurement activities of the Corps of Engineers
  • 211 Real estate activities of the Corps of Engineers in connection with civil works projects
  • 214 Emergency supplies of drinking water
  • 220 Design criteria for dam and lake projects
  • 221 Work for others
  • 222 Engineering and design
  • 223 Boards, commissions, and committees
  • 230 Procedures for implementing NEPA
  • 236 Water resource policies and authorities: Corps of Engineers participation in improvements for environmental quality
  • 238 Water resources policies and authorities: Flood damage reduction measures in urban areas
  • 239 Water resources policies and authorities: Federal participation in covered flood control channels
  • 240 General credit for flood control
  • 241 Flood control cost-sharing requirements under the ability to pay provision
  • 242 Flood Plain Management Services Program establishment of fees for cost recovery
  • 245 Removal of wrecks and other obstructions
  • 263 Continuing authorities programs
  • 273 Aquatic plant control
  • 274 Pest control program for civil works projects
  • 276 Water resources policies and authorities: Application of section 134a of Public Law 94-587
  • 277 Water resources policies and authorities: Navigation policy: Cost apportionment of bridge alterations
  • 279 Resource use: Establishment of objectives
  • 320 General regulatory policies
  • 321 Permits for dams and dikes in navigable waters of the United States
  • 322 Permits for structures or work in or affecting navigable waters of the United States
  • 323 Permits for discharges of dredged or fill material into waters of the United States
  • 324 Permits for ocean dumping of dredged material
  • 325 Processing of Department of the Army permits
  • 326 Enforcement
  • 327 Public hearings
  • 328 Definition of waters of the United States
  • 329 Definition of navigable waters of the United States
  • 330 Nationwide permit program
  • 331 Administrative appeal process
  • 332 Compensatory mitigation for losses of aquatic resources
  • 334 Danger zone and restricted area regulations
  • 335 Operation and maintenance of Army Corps of Engineers civil works projects involving the discharge of dredged or fill material into waters of the U.S. or ocean waters
  • 336 Factors to be considered in the evaluation of Army Corps of Engineers dredging projects involving the discharge of dredged material into waters of the U.S. and ocean waters
  • 337 Practice and procedure
  • 338 Other Corps activities involving the discharge of dredged material or fill into waters of the U.S.
  • 384 Intergovernmental review of Department of the Army Corps of Engineers programs and activities
  • 385 Programmatic regulations for the comprehensive Everglades Restoration Plan
N.B. Chapter, part and section numbers in these listings are not necessarily sequential because the CFR commonly does not use all the numbers in a given range.