skip navigation


TITLE 43 > CHAPTER 12 > SUBCHAPTER I > § 390h–12p

§ 390h–12p. Tooele Wastewater Treatment and Reuse Project

(a) Authorization
The Secretary, in cooperation with Tooele City, Utah, is authorized to participate in the design, planning, and construction of the Tooele Wastewater Treatment and Reuse Project.
(b) Cost share
The Federal share of the cost of a project described in subsection (a) of this section shall not exceed 25 percent of the total cost.
(c) Limitation
The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a) of this section.

LII has no control over and does not endorse any external Internet site that contains links to or references LII.