2006—Subsec. (c)(3).
Pub. L. 109–364, § 130(d)(1), inserted “or ship critical safety item” after “aviation critical safety item”.
Subsec. (g)(2), (3).
Pub. L. 109–364, § 130(d)(2), added par. (2), redesignated former par. (2) as (3), inserted “or ship critical safety item” after “aviation critical safety item” and “, or the seaworthiness of a ship or ship equipment,” after “or equipment”, and substituted “such item” for “the item”.
2003—Subsec. (c)(3).
Pub. L. 108–136, § 802(d)(1), inserted “(or, in the case of a contract for the procurement of an aviation critical safety item, the head of the design control activity for such item)” after “the contracting officer”.
Subsec. (g).
Pub. L. 108–136, § 802(d)(2), added subsec. (g).
1987—Subsec. (a).
Pub. L. 100–26, § 7(k)(3), inserted “the term” after “In this section,”.
Subsec. (c)(1), (3).
Pub. L. 100–26, § 7(i)(4), substituted “October 19, 1984,” for “the date of the enactment of the Defense Procurement Reform Act of 1984”.
Subsec. (c)(4).
Pub. L. 100–26, § 7(d)(5)(A), inserted “(
15 U.S.C.
637
(b)(7))” after “Small Business Act”.
Subsec. (d)(2).
Pub. L. 100–26, § 7(d)(5)(B), inserted “(
15 U.S.C.
632)” after “Small Business Act”.
Section 1216(c)(2) of
Pub. L. 98–525 provided that: “Sections
2319,
2320, and
2321 of title
10, United States Code (as added by subsection (a)), shall apply with respect to solicitations issued after the end of the one-year period beginning on the date of the enactment of this Act [Oct. 19, 1984].”