1980—Subsec. (a)(1).
Pub. L. 96–294 added applicability to geothermal power producers.
Study and Report to Congressional Committees on Application of Provisions Relating to Cogeneration, Small Power Production, and Interconnection Authority to Hydroelectric Power Facilities
For provisions requiring the Federal Energy Regulatory Commission to conduct a study and report to Congress on whether the benefits of this section and section
824a–3 of this title should be applied to hydroelectric power facilities utilizing new dams or diversions, within the meaning of section
824a–3
(k) of this title, see section 8(d) of
Pub. L. 99–495, set out as a note under section
824a–3 of this title.