The term “additional services” means the provision of supplementary power, backup or standby power, maintenance power, or interruptible power to an electric consumer by an electric utility.
The term “waste heat to power system” means a system that generates electricity through the recovery of waste energy.
The terms “electric consumer”, “electric utility”, “interconnection service”, “nonregulated electric utility”, and “State regulatory authority” have the meanings given those terms in the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2601 et seq.), within the meaning of title I of that Act (16 U.S.C. 2611 et seq.).
The terms “combined heat and power system” and “waste energy” have the meanings given those terms in section 6341 of this title.
Not later than 180 days after November 15, 2021, the Secretary, in consultation with the Federal Energy Regulatory Commission and other appropriate entities, shall review existing rules and procedures relating to interconnection service and additional services throughout the United States for electric generation with nameplate capacity up to 150 megawatts connecting at either distribution or transmission voltage levels to identify barriers to the deployment of combined heat and power systems and waste heat to power systems.
Not later than 18 months after November 15, 2021, the Secretary, in consultation with the Federal Energy Regulatory Commission and other appropriate entities, shall issue model guidance for interconnection service and additional services for consideration by State regulatory authorities and nonregulated electric utilities to reduce the barriers identified under subsection (b)(1).